|
|
|
|
|
|
There’s nothing like reading what customers have to say about a product to understand what it can do. Here’s the experience of Statoil, BP and Total taken from several technical papers and articles. Just click on the category header to see their comments.
|
Source publications
1. Saasen, A., Jordal, O.H., Burkhead, D., Berg, P.C., Løklingholm, G., Pedersen, E.S., Turner, J. and Harris, M.J.: “Drilling HT/HP Wells Using a Cesium Formate Based Drilling Fluid,” IADC/SPE 74541, IADC/SPE Drilling Conference, Dallas, 26–28 February 2002.
2. Rommetveit, R., Fjelde, K.K., Aas, B., Day, N.M., Low, E. and Schwartz, H.: “HPHT Well Control; An Integrated Approach,” OTC 15322, Offshore Technology Conference, Houston, May 5–8, 2003.
3. Berg, P.C.,Pederson, E.S., Lauritson,A., Behjat, N., Hagerup-Jenssen S., Howard,S., Olsvik, G., Downs, J.D, Harris, M. and, Turner, J.B: “Drilling, Completion, and Open-Hole Formation Evaluation of High Angle Wells in High Density Cesium Formate Brine: the Kvitebjorn Experience, 2004–2006” SPE/IADC 105773, presented at SPE/IADC Drilling Conference, Amsterdam, The Netherlands, 20–22 February 2007.
4.Brangetto, M, Pasturel, C., Gregoire, M., Ligertwood, J., Downs, J.D., Harris, M. and Turner, J.B.: “Cesium formate brines used as workover, suspension fluids in HPHT field development”, Drilling Contractor, May/June 2007.
5.Roy, A., Parke, J., Morrison, A. and Downs, J.D.: “An Evaluation of Perforating Techniques and Use of Caesium Formate Kill Pills to Maximise Productivity in HPHT Gas Wells and Minimise HSE Risks”, OTC 19242 given at the 2008 Offshore Technology Conference held in Houston, Texas, U.S.A., 5–8 May 2008.
|
|
Full fluid engineering support Stock points and service centres in: • USA • Canada • Argentina • UK • Norway • Singapore
|