Statoil: Kvitebjørn 2007 – present
 Three reservoir sections have been drilled and completed using cesium/potassium formate brine in the Kvitebjørn field since 2007. The
reservoir section was drilled using MPD technology with a specially
designed drilling fluid.
|
|
|
|
| |
|
Statoil: Kvitebjørn 2004 – 2007
 Nine reservoir sections were drilled and seven completed with
cesium/potassium formate brine in the North Sea’s Kvitebjørn field from
2004 to 2007.
|
|
|
|
| |
|
TOTAL: Elgin Franklin 1999 – present

Cesium formate brine has provided
effective well control in over 20 HPHT workover and suspension
operations in the Elgin / Franklin fields in the North Sea.
|
|
|
|
| |
|
TXM: Mako-6 2006 – 2008
 TXM successfully used high-density cesium formate brine as well control fluid during the appraisal of a extreme HPHT basin-centred gas accumulation in Hungary. The well was later suspended three times with cesium formate. The longest suspension period lasted about six months.
|
|
|
|
| |
|
BP: Rhum 2004 – 2005
 Deploying 2.19 s.g. / 18.28 ppg cesium formate brine in HPHT perforating operations brings significant HSE benefits and delivers productive wells with low mechanical skins.
|
|
|
|
| |
|
Statoil: Huldra 2001 – 2002

Six reservoir sections were drilled and completed with cesium / potassium formate brine in the HPHT Huldra field in the North Sea.
|
|
|
|
|
|
|
|
|
|
|
|
|