THE WORLD`S LEADING PRODUCER OF CESIUM FORMATE BRINES FOR THE OIL AND GAS INDUSTRY   SEARCH
Home
News
Our products
Our services
About us
Technical information
Publications
Software
HSE
FAQs
Contact us
Drilling field cases
 
Statoil: Kvitebjørn 2007 – present
 
Three reservoir sections have been drilled and completed using cesium / potassium formate brine in the Kvitebjørn field since 2007. The reservoir section was drilled using MPD technology with a specially designed drilling fluid.
 
Statoil: Kvitebjørn 2004 – 2007
 
Nine reservoir sections were drilled and seven completed with cesium/potassium formate brine in the North Sea’s Kvitebjørn field from 2004 to 2007.
 
Statoil: Huldra 2001 – 2002
 
Six reservoir sections were drilled and completed with cesium / potassium formate brine in the HPHT Huldra field in the North Sea.


  

Full fluid engineering support
Stock points and service
centres in:
• USA
• Canada
• Argentina
• UK
• Norway
• Singapore
 

 Why drill with formates?
• Improves well control
• Faster, safer drilling
• Reduces formation damage
• Eliminates screen plugging
• Improves well integrity
• Reduces HSE risk 
• Enables HPHT in narrow
   drilling windows
 

 

Privacy policy |  Website terms and conditions |  © 2012 Cabot Corporation, M.A.-U.S.A. All rights reserved worldwide.  |  Login