THE WORLD`S LEADING PRODUCER OF CESIUM FORMATE BRINES FOR THE OIL AND GAS INDUSTRY   SEARCH
Home
Drilling fluids
Completion fluids
Intervention fluids
Our products
Our services
About us
> Cabot Specialty Fluids
> History timeline
> Mining pollucite
> Cabot Corporation
Technical information
Publications
Software
HSE
FAQs
Contact us
History timeline

1929

Jack Nutt Mines commenced exploitation of pegmatite deposits in the Bernic Lake area of Canada
1957 Pollucite identified in core cut on behalf of the American Metal Company, Limited
1960 2,500 tons of pollucite mined

1967

After the mines have been abandoned for six years, Chemalloy begins to evaluate the potential for tantalum
1969 Tantalum production commences and pollucite shipments to Russia begins
1970 Chemalloy Minerals acquires 100% ownership of Tanco
1974 Mine focused on lithium carbonate. Kawecki Berylco Industries buys Tantalum Mining Corporation
1980 Kawecki Berlyco Industries changes name to Cabot Berlyco Inc.
1980
 
Cabot Berlyco Inc. amalgamates with Cabot Corporation. Tantalum operations stopped and mine placed on care and maintenance watch

1985

Shell researchers in Sittingbourne (UK) discover that concentrated solutions of formate salts can enhance the thermal stability of drilling fluid polymers
1986 Shell files patent claiming that soluble formate salts exert a stabilising effect on water-soluble polymers at high temperatures
1988 Tantalum operations re-commenced
1990 John Downs in Shell Rijswijk begins to experiment with cesium formate sourced from Chemetall and Cabot
1992
 
International Drilling Fluids introduces the first formate drilling fluids system, IDSALT F, after laboratory work conducted at ID's St. Austell Research Centre
1993
 
 
Cabot Corporation of Boston buys a 100% stake in Tantalum Mining Corporation. At an SPE conference in New Orleans, Shell makes first public disclosure on properties and potential benefits of cesium formate brines for HPHT applications. John Downs visits Cabot in Boston and Tanco to discuss availability
1995
 
 
Schlumberger Dowell Fluids (previously IDF) proposes cesium formate as the best technical solution for the reservoir sections of the Marnock HPHT gas condensate field. The Formate Brine Company (Forbrico) is formed and attempts to secure exclusive supply from Cabot, but Cabot decides to go it alone
1996 Construction of the cesium formate chemical plant commences. Cabot Specialty Fluids Inc. is established in Houston, Texas
1997 Cabot Specialty Fluids North Sea Limited is set up in Aberdeen, Scotland
1998 Cabot Specialty Fluids establishes bulk brine handling facilities in Aberdeen and begins to receive the first production from Canada
1999
 
 
 
First small field trial of cesium formate by Shell Expro in September on the Shearwater field in the UK sector of the North Sea. First major completion fluid application on an extended reach HPHT well in TOTAL's Dunbar field, also in UK North Sea. Later in November 1999, cesium formate is chosen by ELF (now amalgamated with TOTAL) for a series of completion and workover operations in the Elgin Field — the most extreme HPHT field found so far in the North Sea
2000
 
Cabot Specialty Fluids North Sea Ltd. establishes a base in Bergen, Norway and the fluid is used for the first time to drill the reservoir section of an HPHT well in Statoil's Huldra field
2001
 
 
Norsk Hydro becomes the first operator to use cesium formate as a low-solids weighted oil, this time in the Visund field. It is the first application of the fluid in a field with sub-sea wellheads. BP uses cesium formate in the Devenick field in the UK Central North Sea and becomes the second operator to use the fluid for drilling
2002 First use in the Gulf of Mexico on the Ocean Spur rig on BP's High Island A5 well, this time as a coiled tubing intervention fluid
2003
 
 
Marathon becomes the fifth UK operator to use the fluid, this time in its Braemar field. A major milestone is reached as Cabot Specialty Fluids starts it 50th job. This is with Statoil on the Kristin field, the most extreme HPHT field yet to be developed using sub-sea wellheads. Low-solids cesium-weighted oil is also used as completion fluid in Visund, Statfjord, Njord and Gullfaks
2004
 
This year saw the first use of the fluid in the Danish sector of the North Sea by the state-owned operator D.O.N.G. on a well in the South Arne field
2005
 
 
Second application in the GoM by Walter Oil & Gas as a completion fluid in their Mobile Areas 682 well. July also saw ConocoPhillips join the list of UK users with a HPHT completion in the Judy field. In October, Cabot Specialty Fluids's 100th job saw cesium formate used for the first time in a land application as MOL, the Hungarian state-owned oil-company, used it to complete a HPHT gas well
2006
 
 
Cesium formate was used by Statoil to drill and test the longest HPHT well yet drilled on the Norwegian continental shelf for the Valemon prospect. This year also saw the first use of cesium formate in Argentina through Petrobras, including a drillling application in the El Campamento field
2007
 
 
Cabot Specialty Fluids provided completion fluids for the Canadian independent TXM's Mako-6 well in Hungary. It claims the record as the highest temperature use of cesium formate to date — 235°C/455°F. This year also saw another significant breakthrough with the first job in Asia — three offshore completions for ExxonMobil in the Tapis field, Malaysia
2008 Thirty jobs completed in 14 HPHT fields located in six countries. Highlights include six well completions in the Kashagan field, Kazakhstan, including Cabot Specialty Fluids's 200th job, and the first deployment of cesium formate as a designer fluid for managed-pressure drilling in Statoil's Kvitebjørn field
2009 The first drill-stem test operation using cesium formate in a HPHT gas well is completed in Total's Victoria field in the North Sea at reservoir temperatures of 200°C. This is one of 30 operations this year, including a further nine HPHT completions and workovers in Kashagan and operations for Total in Jura, Kessog, Elgin and Victoria



Full fluid engineering support
Stock points and service
centres in:
• USA
• Canada
• Argentina
• UK
• Norway
• Singapore
 
Privacy policy |  Website terms and conditions |  © 2010 Cabot Corporation, M.A.-U.S.A. All rights reserved worldwide.  |  Login